`IDesIDoctags 7JSC23411.1Shana/Nancy Hutchins/jbInfo. Products & Services Div.JF2341 (JSC DRD)gJSC Data Requirements Description (DRD) JSC Form 2341 (Rev February 26, 2002) (Informed February 2002) '4     7 8  nflrx~ &,28>DJPV\bhntz6 sm~i6sm6$*| `mr'{Ps,wGyYhv<t4n"l u8gPrepInst TechnicalAdministrativeSRQADateDRLLineRFPUse ReferencesInterrelDRDTitle PageNumberings40] FSds File ServerJSC" JF2341.itpFTdsFTPJSC_NEF /JF2341.itp6 6HH/6 <HH/: B!fmidJSC23411.1JF2341 (JSC DRD)6 N 8Zh o&rs\lection@6# nT JSC2341a Requirements Descripti1.1~^s`~@d~u`0Shana/Nancy Hutchins/jbInfo. Products & Services Div.JF2341 (JSC DRD)H~u`gJSC Data Requirements Description (DRD) JSC Form 2341 (Rev February 26, 2002) (Informed February 2002)  SignatureVersion|  Data Vers| $ FieldList*DC List|T0 AllSelection@6 CurrSelection@< DesPathInfo@B InvalidSel|N Form Info|T DataPropsZ 'H&Datay{#w4vnut srnmlh$0Information Technology (I/T) Plan@styl  FONTTimes New RomanAstyl  FONTTimes New RomanJSC IT Planning Process, AI-02-069 dated October 23, 2002Astyl  FONTTimes New RomanOProvide and maintain I/T plan for SEDC for Information Resources acquisitions.NAS 9-030442.14 Astyl  FONTTimes New RomanThe contractor shall prepare for the period of performance a plan for acquistion of I/T with annual updates. The plan shall be submitted and include information in accordance with JSC Chief Information Officer (CIO) memorandum AI-02-069, dated October 23, 2002, JSC IT Planning Process. Cost benifit analysis, compatibility-limited requirements, justications for specific make and model and justification for other than full and open competition (JOFOC) shall be submitted with annual updates.DataDataԹ׺rrDataDataH%Datay{#w4vmut srnmlh$0Information Technology (I/T) Plan@styl  FONTTimes New RomanAstyl  FONTTimes New RomanSC IT Planning Process, AI-02-069 dated October 23, 2002Astyl  FONTTimes New RomanOProvide and maintain I/T plan for SEDC for Information Resources acquisitions.NAS 9-030442.14 Astyl  FONTTimes New RomanThe contractor shall prepare for the period of performance a plan for acquistion of I/T with annual updates. The plan shall be submitted and include information in accordance with JSC Chief Information Officer (CIO) memorandum AI-02-069, dated October 23, 2002, JSC IT Planning Process. Cost benifit analysis, compatibility-limited requirements, justications for specific make and model and justification for other than full and open competition (JOFOC) shall be submitted with annual updates.DataDataԹ׺rͺrDataData